Supply & installation of new air conditioning system as indicated on the drawings of Split duct and FAHU.
We will provide the ducts and indoor units for split duct after receiving the advance payment.
For the FAHU will need 14 weeks after receiving the advance payment.
Ducting. Pre insulated aluminum ducting work will be fabricated as per ASHRAE standards.
Outside duct work shall be insulated with 25mm thick 24Kg/Ms fiber glass insulation with 6 Oz canvas cloth & 30-36 Foster/ Fetco.
Acoustic lining inside supply air duct for initial 10 ft. with 12mm thick resin bonded fiber glass insulation.
Grills/ Diffusers/ Refrigerant-Piping. AIRTRON/BETA/AIRMASTER or equivalent make grilles and diffusers in standard
white powder coated finish.
Thermostat controls digital supplied with equipment.
Refrigerant piping will be (KTC) with Aero flex or equivalent insulation.
Vibration isolation pads will be ribbed rubber for units.